Performance Indicators

Although overall consumption of fuel is expected to increase as a result of greater logistical commitments due to ongoing expansion, we plan to reduce the average CO2 emitted per ton of waste collected

Recovery Process

Summary
Our commitment to landfill goes further than focusing on high value recyclates as we belive that an integrated community based infastructure should reflect a wider stakeholder interests.

Performance to date:

495 Tonnes

Target

750 Tonnes

Petrol

Summary

Performance to date:

Target

Logistics CO2

Summary
Although overall consumption of fuel is expected to increase as a result of greater logistical commitments due to ongoing expansion.

Performance to date:

27255KG

Target

38000KG

End of Life Cycles

Summary
We are commited to a policy of ZERO Landfill

Performance to date:

0

Target

0

Donations

Summary
Portfolio which assists stakeholders with their responability to the landfill directive 2004. Thus PCRW shall be our focal recyclates in 2009

Performance to date:

£24,000

Target

£50,000

Collections

Summary
611 Tonnes of waste were collected from recycling sites throughout 2009.

Performance to date:

611 tonnes

Target

1100 tonnes

Location

Registered Office
72 New Bond Street
London
2nd Floor
W1S 1RR
Tel: 0845 6021488

Regional Office
Saturn Centre
Suite 5, 2nd Floor
Spring Road
Ettingshall
Wolverhampton
WV4 6JX
Tel: 01902 405006